How many packaging or bottling facilities do you currently operate?
*
1 Facility
2 to 5 Facilities
6+ Facilities
2. Across your plant(s), how many total active bottling or packaging lines are in operation?
*
1 Line
2 to 4 Lines
5+ Lines
3. How was your primary line designed and integrated?
*
Single OEM turnkey integration
Built in-house / Multi-vendor integrations over time
Inherited legacy line / Mix of old and new equipment
4. What is your current overall equipment effectiveness (OEE) for your primary line?
*
Under 50% OEE
50%–65% OEE
66%–80% OEE
Over 80% OEE
Not sure / Not currently measured
5. Where do you need your line performance to be within the next 12 months?
*
70%–80% OEE — Stabilize daily target output
80%–90%+ OEE — Improve overall line effectiveness
Maintain current output while reducing unscheduled overtime
6. What is the biggest driver of lost production or micro-stoppages on your primary line?
*
Control misalignment & sensor timing issues between machines
Machine breakdowns & mechanical downtime
Changeover delays & operator skill gaps
Accumulation / Conveyance gaps causing upstream backups
7. How quickly does leadership expect payback on capacity recovery initiatives?
*
Under 90 days
3 to 6 months
6 to 12 months
8. What is your primary focus for increasing line output this fiscal year?
*
Recover hidden capacity from existing assets without buying new machines (OpEx focus)
Targeted engineering fixes and control optimization ($25k–$100k budget range)
Open to full line replacement or major equipment capital expenditure ($100k+)