Welcome To:
Execution, Control & Close-Out
(A Five-Part Homeowner Education Series)
Objective: Use the plan with your PM during active work to control quality, cost, changes, and handoff.
Video Explanation
Daily/Weekly PM Workflow (All Trades)
Summary:
Run the job from the plan: daily site checks, weekly coordination, and quick decisions to keep schedule and budget intact.
Action Items:
✅ Require a weekly PM coordination using the plan: upcoming trades, holds, risks.
✅ Have PM post daily photos (deliveries, rough-ins, protection, progress).
✅ Confirm crew briefings: today’s goal, safety, inspection prep.
✅ Keep onsite prints updated when specs change.
✅ Insist on damage logs (incoming materials & adjacent finishes).
Quality Control & Documentation
Tie the plan’s QC steps to measurable checks (elevations, shear nailing, waterproofing, tile layout, paint sheen, HVAC zoning, electrical rough heights).
✅ For each trade, agree with PM on 3–5 QC checks (objective, photo-verifiable).
✅ Run blue-tape walks at defined milestones (pre-cover, pre-final).
✅ Store all QC photos in trade folders (Excavation, Concrete, Framing, etc.).
✅ Make the installer sign punch-list completion on site.
✅ Use “repeat until right” policy: don’t advance the schedule on failed QC.
Change Control & Communication
When scope shifts, use the plan to capture it fast: description, cost, schedule impact, approvals—then freeze it.
✅ Require written COs (description, $$, schedule days, approvals) before work.
✅ Add COs to the plan in red, and update the master schedule.
✅ PM to notify impacted trades and adjust deliveries.
✅ Keep a CO log reviewed at each weekly meeting.
✅ If owner-requested, confirm budget reallocation with PM in writing.
Payments, Waivers & Release to Next Trade
Use the plan to decide when a trade is actually complete: punch closed, photos filed, inspections passed, waivers in, then pay and release.
✅ Tie payment approval to: passed inspection, punch closed, photo proof, conditional→final lien waivers.
✅ Match invoices to plan milestones (Rough-in, Pre-cover, Final).
✅ Keep receipts and warranty info filed per trade.
✅ Require PM to confirm no damage left behind before release.
✅ Update budget actuals vs plan after each trade.
Close-Out, Warranty & Lessons Learned
Finish strong: capture model/serials, maintenance schedules, elevations/as-builts, and lessons learned—so the next trade (or future remodel) runs smoother.
✅ Build a trade close-out packet: model/serial, warranty terms, maintenance intervals, color/sheens, photos.
✅ Add as-built notes (e.g., buried sleeves, conduit paths, drain locations).
✅ Schedule seasonal maintenance reminders (HVAC filters, sealers, caulking).
✅ Hold a post-trade debrief with your PM (what to repeat/avoid).
✅ Archive to the Digital Home Manual and share with the homeowner/office.
Thank you for completing this Session!
Due Diligence is the difference between designing with confidence and building on guesswork.
Home Building Master Class | The Contractor Checklist
What is in the Master Class?
Start Next Session @
www.thecontractorchecklist.com
Promotional Information of the Day
Explore our featured partners:
Nuance Interiors – Professional design studio for material selections and layout support.
Canva – Create stunning mood boards, inspiration layouts, and presentation visuals.
Zeely AI – Transform your photos and concepts into professional visuals in seconds.
Please help us with educating the world by using our affiliate partners.
Explore featured Videos:
How to Get a Building Permit (For Beginners + Detailed Breakdown)
How To Find Building Permits Online? - CountyOffice.org
Interior Design For Beginners || Design Crash Course