Welcome To:
Project Manager Training — Framing Phase
Purpose:Ensure framing plans, structural requirements, and material scope are fully understood before ordering.
Study plans for load paths, heights, spans, and special details
Identify openings: doors, windows, beams, trusses
Confirm 25% contingency due to volatile lumber pricing
✅ Review all structural sheets: shear walls, hold-downs, beams, hardware
✅ Verify inspection list for framing phases (rough, shear, nailing)
✅ Add all contacts (framers, engineers, suppliers) to Bid Sheet
✅ Confirm schedule alignment between framing + windows + MEP starts
✅ Upload a Pre-Framing Plan Review to office for approval
Purpose:Order correctly, reduce jobsite delays, and empower the crew with clarity.
Build comprehensive lumber + hardware list
Validate list with installer — they must sign off
Confirm access for multiple truck deliveries and rooftop loads
✅ Place order only after double confirmation by installer
✅ Schedule boom truck delivery plan with safe lay-down areas
✅ Mark the staging map on the Detail Page → avoid blocking workflow
✅ Document all receipts + pricing changes
✅ Create backup plan for lumber swap-outs (warped / wrong sizes)
✅ Verify who calls inspections and when (footings/shear/nailing)
Purpose:Eliminate surprise delays and ensure site prep supports fast, clean framing.
Verify ALL concrete bearing locations match plans
Confirm hardware lead times — straps, beams, hangers, sheathing
Inform stakeholders proactively if anything shifts
✅ Confirm delivery schedule with suppliers and drivers
✅ Check that framers have direct numbers for lumber salesman
✅ Perform a House Perimeter Walk:
All anchor bolts correct?
Sill plates ready?
Stem walls aligned?
✅ Confirm window order status → align with framing schedule
✅ Plan equipment access → forklift, crane, scaffolding
✅ Document material condition as it arrives with photos
PM Warning:
If bearing points are wrong → framing destroys your budget.Confirm, confirm, confirm.
Purpose:Support workflow, document critical structure, and protect timeline.
✅ Confirm all lumber + hardware is onsite
✅ Walk framing leader through Detail Page expectations
✅ Shoot elevations & record any out-of-level corrections
✅ Track structural hardware installation (shear panels, HD anchors)
✅ Daily punch list updates → send photos to office
✅ Ensure cleanup system so waste doesn’t bury hardware
Communication Prompt:
“If ANYTHING is missing or unclear — tell me NOW. Not tomorrow.”
Purpose:Confirm structure meets design intent and pass inspections before MEP starts.
✅ Blue Tape Framing Walk → mark every correction
✅ Check:
✔ Plumb walls
✔ Straight studs
✔ Window/door openings sized correctly
✔ Nailing patterns compliant
✅ Photo every hold-down, post/beam connection, fire block, and strap
✅ Confirm shear + rough framing inspection passed
✅ Provide complete punch list to framer with deadlines
✅ Schedule next phase handoff → MEP trades
✅ Office confirmation + updated budget
Thank you for completing this Session!
PM Milestone Confirmation✔ Structural integrity verified✔ Material waste minimized✔ Timeline protected✔ Inspection compliance achieved✔ Ready for MEP / HVAC / Electrical