Project Manager Training — Landscaping & Site Work Phase
Purpose:Ensure the entire site performs — managing water, access, and long-term maintenance.
Review plans → confirm:
Drainage slopes away from the home
Retaining walls engineered if required
Tree and site protection areas documented
Irrigation zones and valve locations defined
Confirm plant selections appropriate for:
Soil type
Sun exposure
Water use
✅ Upload site plan with elevation markers to Detail Page
✅ Confirm erosion control requirements with city/county
✅ Verify budget covers: irrigation, topsoil, rock, mulch, sod, plants
✅ Double-check spec sheet with homeowner → signed approval
PM Reminder:
Landscaping is beautiful… but drainage is critical.
Purpose:Prevent product mix-ups, late deliveries, and damaged plant material.
Plan delivery order:
Hardscape → irrigation → soil → plants → mulch
Confirm heavy delivery access
Identify any long lead items (boulders, custom metal edging)
✅ Subcontractor verifies full material list
✅ Track receipts & supplier contacts in Budget Sheet
✅ Confirm irrigation materials + control system included
✅ Schedule weather-sensitive deliveries (plants thrive in shade & water)
✅ Document all products with photos and lot information
Purpose:Prepare site for construction, planting, and equipment traffic.
Mark:
Utility locations
Irrigation valve box locations
Protected trees and root zones
Verify final grade ready before sod or hardscape placement
✅ Confirm erosion control is still functioning
✅ Protect siding and walkways from equipment damage
✅ Plan mud control routes + gravel staging
✅ Confirm garbage & debris plan → landscape creates lots of scrap
✅ Notify neighbors if equipment will block streets
Purpose:Build with precision → control water and create durability.
✅ Confirm slope runs away from foundation minimum 5%
✅ Inspect retaining walls + drainage pipe & rock base
✅ Confirm concrete patios, pavers, and pathways slopes:
Water flows to drains, not door thresholds
✅ Ensure edges installed before planting
✅ Coordinate irrigation sleeves under pathways early
📸 Document all buried drainage repairs + locations for future reference.
Purpose:Establish healthy rooting conditions and functional irrigation system.
✅ Plant selection matches approved design + elevation
✅ Trees staked correctly → not choking trunks
✅ Irrigation controller programmed
Zone labeling
Seasonal schedule preset
✅ Mulch installed with 2–3" depth but not covering stems
✅ Lawn rolls/sod seams tight → no gaps
PM Tip:
After irrigation is turned on, walk the entire site — no overspray on siding or windows
Purpose:Ensure the landscaping is beautiful, healthy, and low-maintenance for the homeowner.
✅ Blue Tape Walk → cleanup & corrections list
✅ Confirm:
✔ Sprinklers adjusted properly
✔ French drains draining correctly
✔ No soil touching siding
✅ Add watering + plant care guide to Homeowner Manual
✅ Confirm installer’s plant warranty terms (usually 6–12 months)
✅ Office approval before payment
🎯 Final Objective:Curb appeal that wows buyers and a site that protects the home for decades.
Thank you for completing this Session!
PM Milestone Confirmation✔ Drainage protected✔ Hardscapes solid & sloped properly✔ Healthy planting & irrigation system✔ ZERO conditions that threaten home structure