Welcome To:
Project Manager Training — Electrical Phase
Purpose:Ensure electrical layout enhances lifestyle, efficiency, and safety — not just meets code.
Architect and homeowner finalize lighting plan
Confirm:
Fixture style + finish + lumen output
Controls / switches / dimming strategy
Specialty circuits (EV charging, hot tub, heat tape, smart home)
✅ Complete Lighting Intent Review:
“How do you use each room from morning to night?”
✅ Confirm accent lighting: stairs, art walls, cabinetry, mirrors
✅ Capture homeowner sign-off on Purchase Order Sheet
✅ Upload all fixture spec sheets to Detail Page
Purpose:Order the right items and avoid electrical delays — #1 cause of schedule stalls.
Separate material list into:
Rough-in components (boxes, wire, cans)
Finish fixtures (pendants, sconce kits, trims)
Confirm lead times for custom fixtures
✅ Electrician reviews fixture list and corrects SKU mistakes
✅ Document all receipts in Expensify → attach supplier invoices
✅ Register warranties — link records to Homeowner Manual
✅ Back-up supplier list created for last-minute fixtures
PM Tip:
Order trim kits and specialty housings before drywall — not during finish phase.
Purpose:Ensure all substrate and trade sequences support a clean rough-in.
Confirm schedule is locked
Verify plumbing, HVAC, windows complete → avoid conflicts
Finalize inspection calendar
✅ Stage fixture boxes + trims → protected storage
✅ Confirm exterior weather-proofing behind fixture penetrations
✅ Test GFCI/AFCI plans in panel layout before installation
✅ Set garbage handling plan (wire scrap gets out of walk paths)
💡 Safety note:Falls, shock, and wiring hazards must be pre-mitigated.
Purpose:Guarantee power distribution and safety routing meet code & homeowner needs.
✅ Walk home with electrician and homeowner
Confirm switch locations at human reach
Confirm outlet counts + heights per room use
✅ Validate specialty requirements:
Heated floors
Under-cabinet lighting
Smart home device power
Low-voltage wiring paths
✅ First-day routing decisions eliminate rework
✅ Label every circuit before panel cover closes
✅ Photograph wire routing before drywall — upload to Homeowner Manual
Purpose:Protect the schedule — electrical inspections can break timelines.
✅ Blue tape corrections → label locations by circuit + room
✅ Confirm:
Rough Electrical Inspection ✅
Smoke/CO device plan approved ✅
Panel labeling complete ✅
✅ Confirm attic + crawl electrical protected from damage
✅ Office confirmation required before payment release
⚠️ No wires should be floating, crushed, or exposed.
Purpose:Achieve clean finish aesthetics and full system functionality.
✅ Confirm ALL finish fixtures are onsite + undamaged
✅ Align switch trim + screw slot orientation
✅ GFCI, ARC fault breakers tested and recorded
✅ All lights programmed & labeled
✅ Confirm fan direction + airflow settings correct
✅ Test exterior lighting after dark
Purpose:Deliver a fully functional and well-documented electrical system.
✅ Final inspection passed
✅ Detailed punch list completed
✅ No wall damage or patching required after fixture install
✅ Homeowner walkthrough:
Smart switches
Panel labeling
Exterior lighting controls
✅ Warranty & manuals uploaded to Homeowner Manual
✅ Office approval → Payment released
🎯 The objective:A safe, well-lit home where every fixture works and every circuit is understood.
Thank you for completing this Session!
PM Milestone Confirmation✔ Lighting intent approved✔ Rough-in documented + inspected✔ Clean and safe final installation✔ Homeowner trained✔ All warranty info saved