Purpose:Ensure the design intent is fully buildable before finish work begins.
Confirm all creative trim details fit the home’s aesthetic
Verify backing/blocking already installed during framing(built-ins, handrails, floating shelves, barn doors)
✅ Confirm door swing direction + door stops
✅ Walk with homeowner → verify trim style:
Craftsman / Modern / Traditional / Shadow reveal
✅ Check reveal lines at windows + staircases
✅ Update Spec Page with every trim detail + attachment method
📌 If backing is missing → correct before scheduling trim.
Purpose:Ensure materials meet design, budget, and dimensional requirements.
Confirm trim sizes, profiles, and wood species
Check door jamb widths (especially SIP walls!)
Confirm stain vs. paint-grade trim compatibility
✅ Finalize Spec Sheet with owner sign-off
✅ Create clear labeling system for storage by room
✅ Document warranty details for doors + moving parts
✅ Update printed plans with current detail drawings
Purpose:Ensure the house is dust-controlled, climate-stabilized, and ready for precision work.
Confirm flooring is protected
Confirm painter + carpenter schedule alignment
Confirm installers fully understand finish details before mobilizing
✅ Confirm delivery schedule for hardware + trim
✅ Prepare actual garbage plan (trim scrap gets messy fast)
✅ Mark every location for:
Built-ins
Shelving
Window stool heights
✅ Update on-site binder and upload digital versions
PM Reminder:
Finish carpentry exposes every mistake from earlier phases.Don’t let painters discover your trim issues later.
Purpose:Deliver clean, high-level finish work that impresses clients.
✅ Blue Tape Walk → look low & look long for reveal shifts
✅ Check:
Casing alignment at every opening
No crown seams telegraphing
Baseboards flush to wall
Proper clearance under doors for flooring + airflow
✅ Dust + site cleanliness → ready for painter
✅ Punch corrections completed before PM approval
PM Tip:
Lighting shows every flaw — always inspect under bright, raking light.
Purpose:Confirm all workmanship exceeds homeowner expectations before payment is released.
✅ Installer signs punch list completion
✅ Confirm door + trim hardware secure and aligned
✅ Homeowner walk-through + documentation
✅ Office confirms all invoices & receipts logged
✅ Final approval → release payment
🎯 Final Goal:A beautifully finished home interior that reflects elite craftsmanship.
Thank you for completing this Session!
PM Milestone Confirmation✔ Backing installed correctly✔ Design details executed perfectly✔ Doors + trim aligned and tight✔ Zero defects or callbacks