The Contractor Checklist

Finish Carpentry Master Class

Project Manager Training — Finish Carpentry Phase

Class 1 of 6 — Design Alignment & Backing Verification

Purpose:
Ensure the design intent is fully buildable before finish work begins.

Key Responsibilities

  • Confirm all creative trim details fit the home’s aesthetic

  • Verify backing/blocking already installed during framing
    (built-ins, handrails, floating shelves, barn doors)

Action Items

  • ✅ Confirm door swing direction + door stops

  • ✅ Walk with homeowner → verify trim style:

    • Craftsman / Modern / Traditional / Shadow reveal

  • ✅ Check reveal lines at windows + staircases

  • ✅ Update Spec Page with every trim detail + attachment method

📌 If backing is missing → correct before scheduling trim.

Class 2 of 6 — Material List, Approvals & Ordering

Purpose:
Ensure materials meet design, budget, and dimensional requirements.

Key Responsibilities

  • Confirm trim sizes, profiles, and wood species

  • Check door jamb widths (especially SIP walls!)

  • Confirm stain vs. paint-grade trim compatibility

Action Items

  • ✅ Finalize Spec Sheet with owner sign-off

  • ✅ Create clear labeling system for storage by room

  • ✅ Document warranty details for doors + moving parts

  • ✅ Update printed plans with current detail drawings

Class 3 of 6 — One-Week-Out Finish Readiness & Workflow Planning

Purpose:
Ensure the house is dust-controlled, climate-stabilized, and ready for precision work.

Key Responsibilities

  • Confirm flooring is protected

  • Confirm painter + carpenter schedule alignment

  • Confirm installers fully understand finish details before mobilizing

Action Items

  • ✅ Confirm delivery schedule for hardware + trim

  • ✅ Prepare actual garbage plan (trim scrap gets messy fast)

  • ✅ Mark every location for:

    • Built-ins

    • Shelving

    • Window stool heights

  • ✅ Update on-site binder and upload digital versions

PM Reminder:

Finish carpentry exposes every mistake from earlier phases.
Don’t let painters discover your trim issues later.

Class 5 of 6 — Detail Verification, Cleanup & Client Ready

Purpose:
Deliver clean, high-level finish work that impresses clients.

Action Items

  • ✅ Blue Tape Walk → look low & look long for reveal shifts

  • ✅ Check:

    • Casing alignment at every opening

    • No crown seams telegraphing

    • Baseboards flush to wall

    • Proper clearance under doors for flooring + airflow

  • ✅ Dust + site cleanliness → ready for painter

  • ✅ Punch corrections completed before PM approval

PM Tip:

Lighting shows every flaw — always inspect under bright, raking light.

Class 6 of 6 — Inspection, Documentation & Payment Approval

Purpose:
Confirm all workmanship exceeds homeowner expectations before payment is released.

Close-Out Requirements

  • ✅ Installer signs punch list completion

  • ✅ Confirm door + trim hardware secure and aligned

  • ✅ Homeowner walk-through + documentation

  • ✅ Office confirms all invoices & receipts logged

  • ✅ Final approval → release payment

🎯 Final Goal:
A beautifully finished home interior that reflects elite craftsmanship.

Thank you for completing this Session!

Finish Carpentry Module Complete

PM Milestone Confirmation
✔ Backing installed correctly
✔ Design details executed perfectly
✔ Doors + trim aligned and tight
✔ Zero defects or callbacks